The following clauses are to the latest revision: |
Clause |
Title |
Archive Date |
QA-CL |
Quality Clause Change Log |
|
QAC-00 |
Test bed for formatting new QCs |
Dec 13, 2015 |
QAC-01 |
Quality Preamble |
Apr 21, 2010 |
QAC01a |
Quality Preamble |
Jul 07, 2014 |
QAC01b |
Quality Preamble |
|
QC01-N |
Material Identification, Damage & Count |
Jan 07, 2016 |
QC01a |
Material Identification And Count |
|
QC02-N |
Certificate of Compliance (C of C) |
Jan 04, 2012 |
QC02a |
Mars Science Laboratory (MSL) Records Retention |
Oct 07, 2014 |
QC02c |
Certificate of Compliance (C of C) |
Jan 07, 2016 |
QC02e |
Certificate of Compliance (C of C) |
Oct 26, 2016 |
QC02f |
Certificate of Compliance (C of C) |
|
QC03 |
Certification of Compliance for Spare Parts |
Apr 24, 2012 |
QC04 |
Certification to JPL's Specification Requirements |
Jan 07, 2016 |
QC04a |
Certification to JPL's Specification Requirements |
|
QC05 |
Supplier Designed Drawing Request (For Commercial and Commercial Off-The-Shelf [COTS] Hardware Only) |
Jan 07, 2016 |
QC05a |
Supplier-Designed Drawing Request (For Commercial and Commercial Off-The-Shelf [COTS] Hardware Only) |
|
QC06-N |
Certification of Compliance (C of C) for Raw Materials/Specific Lots |
Feb 12, 2010 |
QC06a |
Traceability - Raw Materials |
Feb 12, 2010 |
QC06b |
Raw Material Traceability |
Jan 07, 2016 |
QC06c |
Raw Material Traceability |
Sep 01, 2020 |
QC06d |
Raw Material Traceability |
Mar 24, 2021 |
QC06e |
Raw Material Traceability |
|
QC07-N |
Electrical Wire and Cable Test Report |
Jan 07, 2016 |
QC07a |
Electrical Wire and Cable Test Report |
|
QC08-N |
Certificate of Compliance (C of C) - Calibration |
Oct 09, 2014 |
QC09-N |
Pressure Vessel |
Jan 07, 2016 |
QC09a |
Pressure Vessel |
|
QC10 |
Flight O-Ring Requirements |
Oct 09, 2014 |
QC100-S |
SOFTWARE DELIVERY DOCUMENTATION |
Jan 22, 2009 |
QC101-S |
CONTROL OF TEST SOFTWARE |
Jan 22, 2009 |
QC102-S |
CONTRACTOR SOFTWARE QUALITY MANAGEMENT SYSTEM |
Jan 22, 2009 |
QC104 |
Optical Procurement Requirements |
Oct 02, 2009 |
QC104a |
Optics Data and Test Report |
Jan 07, 2016 |
QC104b |
Optics Procurement Requirements |
Aug 18, 2016 |
QC104c |
Optical Test Reports and Data Requirements |
Oct 30, 2023 |
QC104d |
Optical Test Reports and Data Requirements |
|
QC105 |
Prohibited Materials |
Sep 12, 2009 |
QC105a |
Prohibited Materials |
Jul 13, 2010 |
QC105b |
Prohibited Materials |
May 24, 2012 |
QC105c |
Prohibited Materials |
Jan 07, 2016 |
QC105d |
Prohibited Materials |
Jan 03, 2024 |
QC105e |
Prohibited Materials |
|
QC106 |
Electrical, Electronic, And Electromechanical (EEE) Part Traceability |
Jan 07, 2016 |
QC106a |
Original Component Manufacturer Traceability |
Sep 01, 2020 |
QC106b |
Original Component Manufacturer Traceability |
|
QC107 |
Prohibited Materials |
Sep 12, 2009 |
QC108 |
Tin Interconnect Materials |
Sep 12, 2009 |
QC108a |
Tin Interconnect Materials |
Jul 13, 2010 |
QC108b |
Tin Interconnect Materials |
Apr 24, 2012 |
QC109 |
Export Control |
May 07, 2009 |
QC11-N |
High Strength Fastener Requirements |
Jan 07, 2016 |
QC110 |
Bearing Distributor Requirements |
Jan 07, 2016 |
QC110a |
Bearing Distributor Requirements |
Apr 12, 2016 |
QC111 |
Optical Procurement Requirements |
Jan 07, 2016 |
QC111a |
Optical Handling and Packaging Requirements |
Nov 02, 2023 |
QC111b |
Optical Handling and Packaging Requirements |
|
QC112 |
Prohibited Material Suppliers |
Jan 07, 2016 |
QC112a |
Prohibited Material Suppliers |
|
QC113 |
Quality Management System (QMS) Requirement |
Jan 07, 2016 |
QC113a |
Quality Management System (QMS) Requirements |
|
QC114 |
Heat Treat Requirements |
Jan 07, 2016 |
QC114a |
Heat Treat Requirements |
|
QC115 |
Moisture Sensitive Plastic Surface Mount Device Requirements |
Jan 07, 2016 |
QC115a |
Moisture Sensitive Plastic Surface Mount Device Requirements |
|
QC116 |
RF Coupler End-Item Data Package |
Jan 07, 2016 |
QC116a |
RF Coupler End-Item Data Package |
|
QC117 |
Mars 2020 Records Retention |
Jul 07, 2014 |
QC117a |
Mars 2020 Records Retention |
|
QC118 |
Connector Cleanliness Requirements |
|
QC119 |
Records Retention |
Jan 07, 2016 |
QC119a |
Records Retention |
|
QC11a |
High Strength Fastener Requirements |
|
QC12-N |
Limited Life and Age Controlled (Shelf Life) Items |
Dec 30, 2008 |
QC120 |
Nonconformance Processing and Material Review |
|
QC121 |
Tape Quality Requirements |
Aug 22, 2017 |
QC121a |
Tape Quality Requirements |
|
QC122 |
Bare Die Requirements |
|
QC123 |
End Item Data Package – Deliverables to Accompany Printed Wiring Assembly (PWA) |
|
QC124 |
Printed Wiring Assemblies (PWAs) |
|
QC125 |
EUROPA Records Retention |
|
QC127 |
RIME Records Retention |
|
QC128 |
Military Wire & Cable Packaging and Sourcing |
|
QC129 |
Psyche Records Retention |
|
QC12a-N |
Limited Life and Age Controlled (Shelf Life) Items |
Jan 07, 2016 |
QC12b |
Limited Life and Age Controlled (Shelf Life) Items |
|
QC13 |
Evidence of Functional Test |
Jan 07, 2016 |
QC130 |
Prohibited Additive Manufacturing |
Jun 05, 2019 |
QC130a |
Prohibited Additive Manufacturing |
|
QC131 |
Additive Manufacturing Requirements |
|
QC132 |
Metallic Powder Requirements for Additive Manufacturing |
|
QC133 |
Additive Manufacturing Heat Treat Requirements |
|
QC134 |
Ground Support Equipment (GSE) Cable Harness Requirements |
|
QC135 |
Wafer Lot / Diffusion Lot Number |
|
QC136 |
Counterfeit Parts Avoidance |
Jul 25, 2022 |
QC136a |
Counterfeit Parts Avoidance |
Nov 14, 2022 |
QC137 |
MSR Records Retention |
|
QC13a |
Evidence of Functional Test |
|
QC14-N |
Nondestructive Inspection (NDI) / Nondestructive Test (NDT) Certification |
Jan 07, 2016 |
QC14a |
JPL's Review of Radiographic Film (NDT) Reports |
Apr 24, 2012 |
QC14b |
Nondestructive Inspection (NDI) / Nondestructive Test (NDT) Certificate |
|
QC15-N |
Critical Process Certification |
Apr 24, 2012 |
QC15a |
Use of Certified Critical Processor (CCP) From JPL’s ASL |
Apr 24, 2012 |
QC16 |
Process Procedures (for non ISO system suppliers) |
Apr 24, 2012 |
QC17 |
Supplier (Sub-Tier) Process Controls |
Apr 24, 2012 |
QC18-N |
Flow Down Requirements |
Oct 07, 2014 |
QC18a |
JPL Flow Down Requirements |
Jul 07, 2014 |
QC19-N |
Change Control Authority |
Jan 07, 2016 |
QC19a |
Change Control Authority |
|
QC20-N |
First Article Inspection |
Jan 07, 2016 |
QC20a-N |
Delivery of First Article Inspection Records |
Oct 07, 2014 |
QC20b-N |
Retention of First Article |
Apr 24, 2012 |
QC20c-N |
Delivery of First Article |
Apr 24, 2012 |
QC20d |
Source Inspection of First Article |
Apr 24, 2012 |
QC20e |
Delivery of First Article Inspection Records |
|
QC21 |
General Inspection of Received Sub-Components and Sub-Assemblies |
Oct 07, 2014 |
QC21a-N |
Inspection and Test General Clause |
Oct 07, 2014 |
QC22 |
Objective Evidence of Dimensional Inspection |
Jan 07, 2016 |
QC22a |
Objective Evidence of Dimensional Inspection |
May 29, 2018 |
QC22b |
Objective Evidence of Dimensional Inspection |
|
QC23 |
Acceptance Test Procedure Delivery For Approval |
Jan 07, 2016 |
QC23a |
Acceptance Test Procedure Delivery for Approval |
Apr 12, 2016 |
QC24 |
Qualification Test Procedure |
Jan 07, 2016 |
QC24a |
Qualification Test Procedure |
|
QC25 |
Metals Control; Sheet, Tube, Rolled, Wire or Other Fabrication |
Apr 24, 2012 |
QC25a |
Weld Filler Metal Control |
Jan 07, 2016 |
QC25b |
Weld Filler Metal Control |
|
QC27 |
Software Quality Assurance |
Jan 22, 2009 |
QC28-N |
Limited Operating Life Items |
Jan 07, 2016 |
QC28a |
Limited Operating Life Items |
Apr 12, 2016 |
QC29-N |
Quality Records Retention |
Apr 24, 2012 |
QC30A |
CONFIGURATION CONTROL, PRE-SUBMIT REQUIREMENT: |
Apr 24, 2012 |
QC31-N |
EEE Single Lot/Date Code |
Jan 07, 2016 |
QC31a |
EEE Single Lot / Date Code |
|
QC31a-N |
EEE Parts Date of Manufacture |
Oct 07, 2014 |
QC32 |
Acceptance Data Package |
Oct 07, 2014 |
QC32a |
End Item Data Package-Deliverables to Accompany PWB |
Jan 07, 2016 |
QC32b |
End Item Data Package - Deliverables to Accompany Printed Wiring Board (PWB) |
Mar 15, 2017 |
QC32c |
End Item Data Package - Deliverables to Accompany Printed Wiring Board (PWB) |
Jan 09, 2018 |
QC32d |
End Item Data Package - Deliverables to Accompany Printed Wiring Board (PWB) |
Dec 11, 2019 |
QC32e |
End Item Data Package - Deliverables to Accompany Printed Wiring Board (PWB) |
Mar 11, 2021 |
QC32f |
End Item Data Package - Deliverables to Accompany Printed Wiring Board (PWB) |
|
QC33 |
Acceptance Data Pack - Critical Hardware |
Apr 24, 2012 |
QC34-N |
Packaging Requirements |
Jul 01, 2013 |
QC35-N |
Electrostatic Discharge Protection (ESD) Program and Packaging |
Dec 30, 2008 |
QC35a-N |
Electrostatic Discharge (ESD) Control Program |
Jul 01, 2013 |
QC35b |
Electrostatic Discharge (ESD) Control Program |
Jan 07, 2016 |
QC35c |
Electrostatic Discharge (ESD) Control Program |
Aug 18, 2016 |
QC35d |
Electrostatic Discharge (ESD) Control Program |
Mar 07, 2022 |
QC35e |
Electrostatic Discharge (ESD) Control Program |
|
QC36 |
Solvent Containers |
Apr 24, 2012 |
QC37 |
MANUFACTURING PLANNING |
Apr 24, 2012 |
QC38 |
PYROTECHNIC DEVICE MANUFACTURING CONTROLS: |
Jan 07, 2016 |
QC38a |
Pyrotechnic Device Manufacturing Controls |
Apr 12, 2016 |
QC39-N |
Nonconformance Reporting |
Apr 06, 2010 |
QC39a |
Nonconformance Reporting |
Jul 07, 2014 |
QC40 |
Material/Part Marking Required for Each Item |
Apr 24, 2012 |
QC41 |
MATERIAL REVIEW BOARD (MRB) AUTHORITY GRANTED |
May 05, 2011 |
QC41a |
LIMITED MATERIAL REVIEW BOARD (MRB) AUTHORITY GRANTED |
May 05, 2011 |
QC41b |
No Material Review Board (MRB) |
May 05, 2011 |
QC41c |
Limited Material Review Board (MRB) Authority Granted |
Jul 07, 2014 |
QC42 |
CORRECTIVE ACTION |
Apr 24, 2012 |
QC43 |
Chemical and Material Safety Data Sheet (MSDS) |
Jan 07, 2016 |
QC43a |
Chemicals and Material Safety Data Sheet (MSDS) |
Aug 28, 2019 |
QC43b |
Chemicals and Safety Data Sheet (SDS) |
May 28, 2020 |
QC43c |
Technical Data Sheet (TDS) and Safety Data Sheet (SDS) |
|
QC44 |
USE OF JPL APPROVED SUPPLIER LIST (ASL) |
Apr 24, 2012 |
QC45 |
JPL QUALITY ASSURANCE SITE REPRESENTATIVE ASSIGNMENT |
Jan 07, 2016 |
QC45a |
JPL Quality Assurance Site Representative Assignment |
Apr 12, 2016 |
QC46-N |
JPL Source Inspection |
Feb 17, 2010 |
QC46a |
JPL Source Inspection |
Jan 07, 2016 |
QC46b |
JPL Source Inspection |
|
QC47-N |
GOVERNMENT SOURCE INSPECTION (GSI) |
Feb 17, 2010 |
QC47a |
JPL Mandatory Inspection Points |
Feb 17, 2010 |
QC47b |
PWB Inner Layer And Final Source Inspection (JPL MIP) |
Mar 03, 2009 |
QC47b-1 |
PWB Inner Layer And Final Source Inspection (JPL MIP) |
Jan 04, 2012 |
QC47c |
Pre-Cap Inspection On Electronic Parts (JPL MIP) |
Feb 17, 2010 |
QC47d |
In-Process Inspection (JPL MIP) |
Feb 17, 2010 |
QC47e |
Final Inspection (JPL MIP) |
Feb 17, 2010 |
QC47f |
PWB Inner Layer Inspection |
Jan 07, 2016 |
QC47g |
Printed Wiring Board (PWB) Inner Layer Inspection |
|
QC48 |
JPL Test Witness Source Inspection is Required |
Apr 24, 2012 |
QC49-N |
CALIBRATION SYSTEM REQUIREMENT [NASA AQC09] |
Apr 24, 2012 |
QC50 |
CONTRACTOR INSPECTION REQUIREMENTS (NON-FLIGHT OR NON-CRITICAL GSE HARDWARE) |
Apr 24, 2012 |
QC51 |
NSTS 5300.4 (CURRENT REV.) INSPECTION SYSTEM |
Apr 24, 2012 |
QC52-N |
QUALITY MANAGEMENT SYSTEM [NASA AQC02] |
Apr 24, 2012 |
QC53 |
INSPECTION SYSTEM PLAN |
Apr 24, 2012 |
QC60 |
Submission and Approval of Flowchart(s) |
Apr 24, 2012 |
QC61 |
OXYGEN COMPATIBILITY TESTING |
Apr 24, 2012 |
QC63-N |
Right of Access |
Jul 07, 2014 |
QC64-N |
GIDEP Alert and Problem Advisories |
Jan 07, 2016 |
QC64a |
GIDEP Alert and Problem Advisories |
Apr 12, 2016 |
QC65-N |
Special Process Certification |
Jan 07, 2016 |
QC65a |
Special Process Certification |
|
QC66 |
HANDLING OF BERYLLIUM |
Jan 07, 2016 |
QC66a |
Handling of Beryllium |
|
QC67 |
CONTRACTOR’S RESPONSIBILITY FOR SUPPLYING ELECTROSTATIC DISCHARGE (ESD) PACKAGING AND PERSONAL PROTECTIVE CLEAN ROOM DEVICES |
Apr 24, 2012 |
QC68 |
Workmanship Specification |
Oct 09, 2014 |
QC69-N |
Packaging, Handling & Labeling |
Jul 01, 2013 |
QC69b |
Packaging, Handling, and Labeling |
Jan 07, 2016 |
QC69c |
Packaging, Handling, and Labeling |
Feb 25, 2019 |
QC69d |
Packaging, Handling, and Labeling |
Apr 19, 2022 |
QC69e |
Packaging, Handling, and Labeling |
Nov 30, 2023 |
QC69f |
Packaging, Handling, and Labeling |
|
QC70 |
Printed Wiring Boards (PWB) |
Jan 07, 2016 |
QC70a |
Printed Wiring Boards (PWBs) |
|
QC71 |
Flexible and Rigid-Flexible Printed Wiring Boards |
Jan 07, 2016 |
QC71a |
Flexible and Rigid-Flexible Printed Wiring Boards |
|
QC72 |
Quality Management System Per AS9100 |
Jan 04, 2010 |
QC73 |
Quality Management System Per AS9003 |
Jan 04, 2010 |
QC74 |
Quality Management System For Distributors Per AS9120 |
Jan 04, 2010 |
QC75 |
FOD Prevention Program |
Apr 24, 2012 |
QC76 |
NADCAP Accreditation of Special Process Sources |
Sep 27, 2010 |
QC76a |
Nadcap Accreditation of Special Processes |
Jan 07, 2016 |
QC76b |
Nadcap Accreditation of Special Processes |
|
QC77 |
Electrostatic Discharge (ESD) Protection Program and Packaging per JPL D-1348 |
Jan 07, 2016 |
QC77a |
Electrostatic Discharge (ESD) Protection Program and Packaging (JPL D-1348) |
Apr 12, 2016 |
QC78 |
Quality Management System Per ISO 9001:2000 |
Jan 04, 2010 |
QC79 |
Quality Management System for Distributors or Manufacturers (COTS) |
Jan 04, 2010 |
QC80-S |
USE OF COMMERCIAL OR COTS SOFTWARE AS PART OF CLASS A OR CLASS B SOFTWARE |
Jan 22, 2009 |
QC81-S |
TECHNICAL AND PROJECT REVIEWS |
Apr 24, 2012 |
QC82 |
SOFTWARE CONFIGURATION MANAGEMENT SYSTEM (LESS THAN ISO 10007) |
Jan 22, 2009 |
QC83-S |
SYSTEM REQUIREMENTS REVIEW (SRR) DOCUMENTATION |
Jan 22, 2009 |
QC84-S |
SOFTWARE DEVELOPMENT ENVIRONMENTAL CHANGES |
Jan 22, 2009 |
QC85-S |
SOFTWARE NONCONFORMANCE REPORTING |
Jan 22, 2009 |
QC86 |
CORRECTIVE ACTION |
Apr 24, 2012 |
QC87-S |
SOFTWARE TESTING |
Jan 22, 2009 |
QC88-S |
FLIGHT SOFTWARE MARGINS |
Jan 22, 2009 |
QC89-S |
PRELIMINARY DESIGN REVIEW (PDR) DOCUMENTATION |
Jan 22, 2009 |
QC90-S |
SOFTWARE QUALIFICATION TEST (SQT) |
Jan 22, 2009 |
QC91-S |
CRITICAL DESIGN REVIEW (CDR) DOCUMENTATION |
Jan 22, 2009 |
QC92-S |
TEST READINESS REVIEW (TRR) DOCUMENTATION |
Jan 22, 2009 |
QC93-S |
SYSTEM DELIVERY REVIEW (SDR) DOCUMENTATION |
Jan 22, 2009 |
QC94-S |
SOFTWARE QUALITY ASSURANCE (SQA) |
Jan 22, 2009 |
QC95-S |
INDEPENDENT VERIFICATION AND VALIDATION (IV&V) |
Jan 22, 2009 |
QC96-S |
CAPABILITY MATURITY MODEL INTEGRATION (CMMI) |
Jan 22, 2009 |
QC97-S |
Software Development Programs (ISO 90003:2004): |
Jan 22, 2009 |
QC98-S |
Software Configuration Control |
Jan 22, 2009 |
QC99-S |
JPL Software Audits |
Jan 22, 2009 |