QC13a - Evidence of Functional Test:

Subcontractor shall provide quantitative results (i.e., demonstration of nominal operating load or pressure, maximum proof load or pressure the hardware was subjected to, electrical resistance and continuity) of functional tests and a certificate stating that the test and inspection was performed per Subcontract/Purchase Order (PO) requirements.

Sketches and/or drawings of the test setup shall remain on file by the Subcontractor for a period of seven (7) years, unless otherwise specified, and be available for review by JPL. Certificates of functional tests shall be signed and dated by a Subcontractor authorized representative and shall include JPL’s Subcontract/PO and line item numbers.