QC47f PWB INNER LAYER INSPECTION
General Requirements
·
The Contractor shall perform 100%
inspection of the multilayer board (MLB) inner layers using Automatic Optical
Inspection (AOI) prior to the lamination process.
·
AOI inspection shall be conducted in
accordance with the latest version of IPC-A-600, Acceptability of Printed
Boards, and the performance requirements of the applicable IPC-6010 series
documents, Class 3 Performance, High Reliability Electronic Products or Class C
for High Performance High Density Interconnects.
·
All MLBs with defective inner layers
shall be discarded.
Reporting
Requirements
·
The Contractor shall provide with
each shipment, a signed Certificate of Conformance that AOI inner layer
inspection was performed to verify the following:
o
For rigid inner layers - All inner
layers have been inspected by AOI to IPC-6011/6012 Class 3 requirements.
o
For flex inner layers - All inner
layers have been inspected by AOI to IPC-6011/6013 Class 3 requirements.
Source Inspection
Requirements
·
If Contractor is not AOI capable,
Contractor shall notify
JPL Procurement Quality Assurance Office at (818) 393-7592 to coordinate the
inner-layer source inspection.
·
JPL
requires a minimum number of working days advance notice to schedule a date for
the JPL source inspection.
Contractor
Location to JPL
|
Business
Days
Advance
Notice
|
Notes
|
Local:
California
|
3
days
|
Minimum
required
|
National:
Continental U.S.
|
5
days
|
Minimum
required
|
International
|
10
days
|
Long
lead time/forecasting desired
|