QC81-S             TECHNICAL AND PROJECT REVIEWS:

 

Each program is evaluated at certain points in its implementation. The purpose of these reviews is to establish the program's status, if it has completed its current phase, and to determine if it is ready to continue into the next phase. As a minimum, Contractor shall support performing Technical and Project Reviews with JPL by providing the following essential documentations:

·       System Requirement Review (SRR): The System Requirements Review evaluates the completeness, consistency, and achievability of system, subsystem, assembly, and program set requirements necessary to fulfill the mission needs.

·       Preliminary Design Review (PDR): The Preliminary Design Review evaluates the readiness of the project, system, subsystem, assembly, or program set to proceed with detail design.

·       Critical Design Review (CDR): The Critical Design Review evaluates the readiness of the project, system, subsystem, assembly, or program set to proceed with development, including coding, assembly of code, integration, and test.

·       Test Readiness Review (TRR): The Test Readiness Review evaluates the readiness of the product or process to be tested for JPL, plus the readiness of test procedures, test equipment, and test facilities for use.

·       System Delivery Review (SDR): The System Delivery Review evaluates the readiness of the product or process for delivery to JPL or to a launch site, usually associated with transition to a subsequent phase.

It is recommended that Contractor precede these reviews with its own internal reviews of project status and the material to be presented.